Peristaltic Pump Installation and Piping
Peristaltic Pump Installation and Piping Stable Installation:The pump should be installed on a stable surface to reduce vibration and noise. Flexible Connection:A flexible or rigid short section (approximately 80-100 cm) should be installed between the pump's outlet flange and the pipeline to facilitate tube replacement. Installation Height:The pump can be installed above the material level...
0 Комментарии 0 Поделились